{"id":7223,"date":"2021-08-20T00:00:00","date_gmt":"2021-08-20T00:00:00","guid":{"rendered":"https:\/\/bxglobal.wpengine.com\/ca\/how-to-estimate-construction-time-for-your-project\/"},"modified":"2026-01-20T10:33:22","modified_gmt":"2026-01-20T15:33:22","slug":"how-to-estimate-construction-time","status":"publish","type":"post","link":"https:\/\/stg2.buildxact.com\/ca\/blog\/how-to-estimate-construction-time\/","title":{"rendered":"How to estimate construction time for your project"},"content":{"rendered":"<p><em>5 minute read&nbsp;<\/em><\/p>\n<p><span data-contrast=\"auto\">While estimating construction project costs is&nbsp;pretty straightforward,&nbsp;<\/span><a href=\"\/ca\/blog\/3-reasons-use-estimating-software\/\"><span data-contrast=\"none\">putting together a schedule for the project can be more difficult<\/span><\/a><span data-contrast=\"auto\">. You must be able to predict how long it will take to complete certain tasks, put them in the correct order, and connect them appropriately to their predecessor and successor tasks.&nbsp;<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:360}\">&nbsp;<\/span><\/p>\n<p><span data-contrast=\"auto\">There are a few ways to predict how long a project or task will take:<\/span><span data-contrast=\"auto\">&nbsp;<\/span><span data-contrast=\"auto\">experience, standard labor calculators<\/span><span data-contrast=\"auto\">,<\/span><span data-contrast=\"auto\">&nbsp;and asking subcontractors. We\u2019ll&nbsp;take a look&nbsp;at these three options to estimate construction time and<\/span><span data-contrast=\"auto\">&nbsp;consider external<\/span><span data-contrast=\"auto\"> conditions that may affect the ultimate duration of a project.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:360}\">&nbsp;<\/span><\/p>\n<h3><strong>Past experience&nbsp;<\/strong><\/h3>\n<p><span data-contrast=\"auto\">The&nbsp;best way to estimate the amount of time it will take to complete a project is to base it on a&nbsp;<\/span><span data-contrast=\"auto\">similar&nbsp;<\/span><span data-contrast=\"auto\">past project<\/span><span data-contrast=\"auto\">. <\/span><span data-contrast=\"auto\">The data will be more accurate than labor calculators or other estimation methods<\/span><span data-contrast=\"auto\"> since<\/span><span data-contrast=\"auto\">&nbsp;<\/span><span data-contrast=\"auto\">the data<\/span><span data-contrast=\"auto\">&nbsp;is based on real activities<\/span><span data-contrast=\"auto\">.<\/span><\/p>\n<p><span data-contrast=\"auto\">You&nbsp;<\/span><span data-contrast=\"auto\">might <\/span><span data-contrast=\"auto\">have to do some calculations when making<\/span><span data-contrast=\"auto\">&nbsp;<\/span><span data-contrast=\"auto\">comparison<\/span><span data-contrast=\"auto\">s<\/span><span data-contrast=\"auto\">. For example, if laying 100 linear feet of&nbsp;5-foot-tall&nbsp;brick&nbsp;wall&nbsp;takes your&nbsp;crew&nbsp;40 manhours, then&nbsp;you can&nbsp;estimate that it will take your&nbsp;crew&nbsp;20 manhours to lay 50 linear feet&nbsp;of<\/span><span data-contrast=\"auto\">&nbsp;a<\/span><span data-contrast=\"auto\">&nbsp;similar brick wall.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:360}\">&nbsp;<\/span><\/p>\n<p><span data-contrast=\"auto\">The accuracy of your&nbsp;estimate&nbsp;will depend on&nbsp;<\/span><span data-contrast=\"auto\">the accuracy of the records from past projects<\/span><span data-contrast=\"auto\">. The more detailed your record-keeping, you\u2019ll more easily be able to extrapolate <span class=\"NormalTextRun BCX0 SCXW266677681\">an estimate. It pays to keep detailed records, especially when it<\/span><span class=\"NormalTextRun BCX0 SCXW266677681\">&nbsp;comes to tracking&nbsp;<\/span><span class=\"NormalTextRun BCX0 SCXW266677681\">productivity<\/span><span class=\"NormalTextRun BCX0 SCXW266677681\">.<\/span><\/span><\/p>\n<h3><strong>Standard labor calculators&nbsp;<\/strong><\/h3>\n<p><span class=\"TextRun SCXW220526713 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW220526713 BCX0\">If&nbsp;<\/span><span class=\"NormalTextRun SCXW220526713 BCX0\">you<\/span><span class=\"NormalTextRun SCXW220526713 BCX0\">&nbsp;are&nbsp;<\/span><span class=\"NormalTextRun SCXW220526713 BCX0\">a new company or don\u2019t have prior experience to&nbsp;<\/span><\/span><a class=\"Hyperlink SCXW220526713 BCX0\" href=\"\/ca\/blog\/building-cost-estimating\/\" target=\"_blank\" rel=\"noreferrer noopener\"><span class=\"TrackChangeTextInsertion TrackedChange SCXW220526713 BCX0\"><span class=\"FieldRange SCXW220526713 BCX0\"><span class=\"TextRun Underlined SCXW220526713 BCX0\" lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW220526713 BCX0\" data-ccp-charstyle=\"Hyperlink\">determine how long a project will take<\/span><\/span><\/span><\/span><\/a><span class=\"TextRun SCXW220526713 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW220526713 BCX0\">, you can refer to standard labor<\/span><span class=\"NormalTextRun SCXW220526713 BCX0\">&nbsp;calculators&nbsp;<\/span><span class=\"NormalTextRun SCXW220526713 BCX0\">to get an idea of&nbsp;<\/span><span class=\"NormalTextRun SCXW220526713 BCX0\">a&nbsp;<\/span><span class=\"NormalTextRun SCXW220526713 BCX0\">task<\/span><span class=\"NormalTextRun SCXW220526713 BCX0\">\u2019<\/span><span class=\"NormalTextRun SCXW220526713 BCX0\">s duration. There are many labor calculators available,&nbsp;<\/span><span class=\"NormalTextRun SCXW220526713 BCX0\">some&nbsp;<\/span><span class=\"NormalTextRun SCXW220526713 BCX0\">provided by professional organizations, like&nbsp;<\/span><\/span><a class=\"Hyperlink SCXW220526713 BCX0\" href=\"https:\/\/www.googleadservices.com\/pagead\/aclk?sa=L&amp;ai=DChcSEwjN2KTIxejxAhV0H60GHXfbAq8YABAAGgJwdg&amp;ae=2&amp;ohost=www.google.com&amp;cid=CAESQOD29o20yQyA0j-tTWc6fTi-uGwfYvB6jnQAJWrJIdESxkA4L1KzVaQ-6ZYT7Sl-_KMMBv6REvCKonXVeeKgZ9w&amp;sig=AOD64_2nEnlH_mjThEMq5MQVGbdDPXfRzw&amp;q&amp;adurl&amp;ved=2ahUKEwj-jZzIxejxAhXJpZ4KHTS4BkQQ0Qx6BAgEEAE\" target=\"_blank\" rel=\"noreferrer noopener\"><span class=\"TextRun Underlined SCXW220526713 BCX0\" lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW220526713 BCX0\" data-ccp-charstyle=\"Hyperlink\">RS<\/span><span class=\"NormalTextRun SCXW220526713 BCX0\" data-ccp-charstyle=\"Hyperlink\">Me<\/span><span class=\"NormalTextRun SCXW220526713 BCX0\" data-ccp-charstyle=\"Hyperlink\">ans<\/span><\/span><\/a><span class=\"TextRun SCXW220526713 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW220526713 BCX0\">.<\/span><span class=\"NormalTextRun SCXW220526713 BCX0\">&nbsp;<\/span><span class=\"NormalTextRun SpellingErrorV2 SCXW220526713 BCX0\">RSMeans<\/span><span class=\"NormalTextRun SCXW220526713 BCX0\">&nbsp;gathers cost and duration information on projects around the United States and publishes<\/span><\/span><span class=\"TrackChangeTextDeletion TrackedChange SCXW220526713 BCX0\"><span class=\"TextRun SCXW220526713 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW220526713 BCX0\"> i<\/span><\/span><\/span><span class=\"TrackChangeTextInsertion TrackedChange SCXW220526713 BCX0\"><span class=\"TextRun SCXW220526713 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW220526713 BCX0\">t<\/span><\/span><\/span><span class=\"TextRun SCXW220526713 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW220526713 BCX0\">&nbsp;as a cost index that many contractors rely on when doing&nbsp;<\/span><span class=\"NormalTextRun SCXW220526713 BCX0\">estimate<\/span><span class=\"NormalTextRun SCXW220526713 BCX0\">s or schedules.<\/span><\/span><span class=\"EOP SCXW220526713 BCX0\" data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:360}\">&nbsp;<\/span><\/p>\n<p><span class=\"TextRun SCXW243614088 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW243614088 BCX0\">You can use s<\/span><\/span><span class=\"TrackChangeTextInsertion TrackedChange SCXW243614088 BCX0\"><span class=\"TextRun SCXW243614088 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SpellingErrorV2 SCXW243614088 BCX0\">tandard<\/span><\/span><\/span><span class=\"TrackChangeTextInsertion TrackedChange SCXW243614088 BCX0\"><span class=\"TextRun SCXW243614088 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW243614088 BCX0\">&nbsp;labor&nbsp;<\/span><\/span><\/span><span class=\"TextRun SCXW243614088 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW243614088 BCX0\">calculators to estimate the amount of time it&nbsp;<\/span><span class=\"NormalTextRun SCXW243614088 BCX0\">might&nbsp;<\/span><span class=\"NormalTextRun SCXW243614088 BCX0\">take for a<\/span><\/span><span class=\"TrackChangeTextInsertion TrackedChange SCXW243614088 BCX0\"><span class=\"TextRun SCXW243614088 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW243614088 BCX0\">&nbsp;full or partial<\/span><\/span><\/span><span class=\"TextRun SCXW243614088 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW243614088 BCX0\">&nbsp;project<\/span><\/span><span class=\"TrackChangeTextDeletion TrackedChange SCXW243614088 BCX0\"><span class=\"TextRun SCXW243614088 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW243614088 BCX0\">.<\/span><\/span><\/span><span class=\"TextRun SCXW243614088 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW243614088 BCX0\">&nbsp;For example, you can get an approximate time estimation<\/span><span class=\"NormalTextRun SCXW243614088 BCX0\">&nbsp;for a two-<\/span><span class=\"NormalTextRun SCXW243614088 BCX0\">story&nbsp;<\/span><span class=\"NormalTextRun SCXW243614088 BCX0\">commercial office building, or you can find&nbsp;<\/span><span class=\"NormalTextRun SCXW243614088 BCX0\">out&nbsp;<\/span><span class=\"NormalTextRun SCXW243614088 BCX0\">how long&nbsp;<\/span><span class=\"NormalTextRun SCXW243614088 BCX0\">it will take&nbsp;<\/span><span class=\"NormalTextRun SCXW243614088 BCX0\">a plumber to lay 100 feet of&nbsp;<\/span><span class=\"NormalTextRun SCXW243614088 BCX0\">\u00be&nbsp;<\/span><span class=\"NormalTextRun SCXW243614088 BCX0\">inch copper piping. Using this&nbsp;<\/span><span class=\"NormalTextRun SCXW243614088 BCX0\">information,<\/span><span class=\"NormalTextRun SCXW243614088 BCX0\">&nbsp;<\/span><span class=\"NormalTextRun SCXW243614088 BCX0\">you can&nbsp;<\/span><span class=\"NormalTextRun SCXW243614088 BCX0\">determine how&nbsp;<\/span><span class=\"NormalTextRun SCXW243614088 BCX0\">long&nbsp;<\/span><span class=\"NormalTextRun SCXW243614088 BCX0\">a project will take by breaking it up into&nbsp;<\/span><span class=\"NormalTextRun SCXW243614088 BCX0\">smaller&nbsp;<\/span><span class=\"NormalTextRun SCXW243614088 BCX0\">sections and scopes.<\/span><\/span><span class=\"EOP SCXW243614088 BCX0\" data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:360}\">&nbsp;<\/span><\/p>\n<p><span class=\"TextRun SCXW113683085 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW113683085 BCX0\">It\u2019s <\/span><span class=\"NormalTextRun SCXW113683085 BCX0\">important to&nbsp;<\/span><span class=\"NormalTextRun SCXW113683085 BCX0\">note that&nbsp;<\/span><\/span><span class=\"TrackChangeTextInsertion TrackedChange SCXW113683085 BCX0\"><span class=\"TextRun SCXW113683085 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW113683085 BCX0\">standard labor calculators<\/span><\/span><\/span><span class=\"TextRun SCXW113683085 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW113683085 BCX0\">&nbsp;may not reflect<\/span><span class=\"NormalTextRun SCXW113683085 BCX0\">&nbsp;durations&nbsp;<\/span><span class=\"NormalTextRun SCXW113683085 BCX0\">and costs in the<\/span><span class=\"NormalTextRun SCXW113683085 BCX0\">&nbsp;region&nbsp;<\/span><span class=\"NormalTextRun SCXW113683085 BCX0\">the project&nbsp;<\/span><span class=\"NormalTextRun SCXW113683085 BCX0\">is&nbsp;<\/span><span class=\"NormalTextRun SCXW113683085 BCX0\">located. You may need&nbsp;<\/span><span class=\"NormalTextRun SCXW113683085 BCX0\">to add<\/span><\/span><span class=\"TrackChangeTextInsertion TrackedChange SCXW113683085 BCX0\"><span class=\"TextRun SCXW113683085 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW113683085 BCX0\">&nbsp;or subtract<\/span><\/span><\/span><span class=\"TrackChangeTextDeletion TrackedChange SCXW113683085 BCX0\"><span class=\"TextRun SCXW113683085 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW113683085 BCX0\">&nbsp;<\/span><\/span><\/span><span class=\"TextRun SCXW113683085 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW113683085 BCX0\">time<\/span><\/span><span class=\"TrackChangeTextDeletion TrackedChange SCXW113683085 BCX0\"><span class=\"TextRun SCXW113683085 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW113683085 BCX0\">&nbsp;<\/span><\/span><\/span><span class=\"TextRun SCXW113683085 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW113683085 BCX0\">to<\/span><span class=\"NormalTextRun SCXW113683085 BCX0\">&nbsp;reflect a more accurate estimate.<\/span><span class=\"NormalTextRun SCXW113683085 BCX0\">&nbsp;<\/span><\/span><\/p>\n<p><iframe title=\"Develop accurate estimates up to 5x times faster with Buildxact\" width=\"1200\" height=\"675\" src=\"https:\/\/www.youtube.com\/embed\/91BjHIAn82k?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture\" allowfullscreen><\/iframe><\/p>\n<h3><strong>Ask a subcontractor<\/strong><\/h3>\n<p><span class=\"TrackChangeTextInsertion TrackedChange SCXW65632579 BCX0\"><span class=\"TextRun SCXW65632579 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW65632579 BCX0\">The subcontractor can provide the duration for a particular task.<\/span><\/span><\/span><span class=\"TextRun SCXW65632579 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW65632579 BCX0\">&nbsp;Once the&nbsp;<\/span><span class=\"NormalTextRun SCXW65632579 BCX0\">subcontractors<\/span><span class=\"NormalTextRun SCXW65632579 BCX0\"> are selected, the <\/span><\/span><span class=\"TrackChangeTextInsertion TrackedChange SCXW65632579 BCX0\"><span class=\"TextRun SCXW65632579 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW65632579 BCX0\">general contractor<\/span><\/span><\/span><span class=\"TextRun SCXW65632579 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW65632579 BCX0\">&nbsp;ask<\/span><span class=\"NormalTextRun SCXW65632579 BCX0\">s them<\/span><span class=\"NormalTextRun SCXW65632579 BCX0\"> to provide a schedule for their work, and the <\/span><\/span><span class=\"TrackChangeTextInsertion TrackedChange SCXW65632579 BCX0\"><span class=\"TextRun SCXW65632579 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW65632579 BCX0\">general contractor<\/span><\/span><\/span><span class=\"TextRun SCXW65632579 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW65632579 BCX0\">&nbsp;incorporate<\/span><span class=\"NormalTextRun SCXW65632579 BCX0\">s<\/span><span class=\"NormalTextRun SCXW65632579 BCX0\">&nbsp;all the&nbsp;<\/span><\/span><span class=\"TrackChangeTextDeletion TrackedChange SCXW65632579 BCX0\"><span class=\"TextRun SCXW65632579 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW65632579 BCX0\">subs&nbsp;<\/span><\/span><\/span><span class=\"TextRun SCXW65632579 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW65632579 BCX0\">schedules together.<\/span><\/span><\/p>\n<h3><strong>Conditions that may affect schedule duration<\/strong><\/h3>\n<p><span class=\"TextRun SCXW102388029 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW102388029 BCX0\">Even the most&nbsp;<\/span><span class=\"NormalTextRun SCXW102388029 BCX0\">complete project schedule&nbsp;<\/span><span class=\"NormalTextRun SCXW102388029 BCX0\">can be affected by&nbsp;<\/span><span class=\"NormalTextRun SCXW102388029 BCX0\">several outside f<\/span><\/span><span class=\"TrackChangeTextInsertion TrackedChange SCXW102388029 BCX0\"><span class=\"TextRun SCXW102388029 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW102388029 BCX0\">actors<\/span><\/span><\/span><span class=\"TextRun SCXW102388029 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW102388029 BCX0\">.<\/span><\/span><span class=\"EOP SCXW102388029 BCX0\" data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:360}\">&nbsp;<\/span><\/p>\n<p><span class=\"TextRun BCX0 SCXW197417051\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun BCX0 SCXW197417051\">Material delay<\/span><span class=\"NormalTextRun BCX0 SCXW197417051\">s<\/span><span class=\"NormalTextRun BCX0 SCXW197417051\">&nbsp;are a hot topic now in construction. Lumber<\/span><span class=\"NormalTextRun BCX0 SCXW197417051\">,<\/span><span class=\"NormalTextRun BCX0 SCXW197417051\">&nbsp;steel<\/span><\/span><span class=\"TrackChangeTextDeletion TrackedChange BCX0 SCXW197417051\"><span class=\"TextRun BCX0 SCXW197417051\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun BCX0 SCXW197417051\">,<\/span><\/span><\/span><span class=\"TextRun BCX0 SCXW197417051\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun BCX0 SCXW197417051\"> and other materials are suffering from production slowdowns caused by the C<\/span><\/span><span class=\"TextRun BCX0 SCXW197417051\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SpellingErrorV2 BCX0 SCXW197417051\">o<\/span><span class=\"NormalTextRun SpellingErrorV2 BCX0 SCXW197417051\">ronavirus<\/span><span class=\"NormalTextRun BCX0 SCXW197417051\">.&nbsp;<\/span><\/span><span class=\"TrackChangeTextInsertion TrackedChange BCX0 SCXW197417051\"><span class=\"TextRun BCX0 SCXW197417051\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun BCX0 SCXW197417051\">There is a domino effect when materials aren\u2019t on-site causing delays all&nbsp;<\/span><\/span><\/span><span class=\"TrackChangeTextInsertion TrackedChange BCX0 SCXW197417051\"><span class=\"TextRun BCX0 SCXW197417051\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun BCX0 SCXW197417051\">around.<\/span><\/span><\/span><\/p>\n<p><span data-contrast=\"auto\">Weather conditions&nbsp;can also&nbsp;affect the progress of work on<\/span><span data-contrast=\"auto\">&#8211;<\/span><span data-contrast=\"auto\">site. Severe rains, cold, or heat can impede the productivity of workers on-site<\/span><span data-contrast=\"auto\">, causing delays in the schedule. Crews may also have to&nbsp;repair&nbsp;work&nbsp;in&nbsp;areas damaged by the weather, further delaying completion.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:360}\">&nbsp;<\/span><\/p>\n<p><span data-contrast=\"auto\">Labor shortages or unavailability affects progress on a construction project. When a contractor doesn\u2019t send enough workers to the jobsite to complete the work needed, everything gets delayed. A sub<\/span><span data-contrast=\"auto\">contractor <\/span><span data-contrast=\"auto\">may&nbsp;<\/span><span data-contrast=\"auto\">need<\/span><span data-contrast=\"auto\">&nbsp;to&nbsp;send workers to another project to combat delays there, thus causing more issues on your project. It can be&nbsp;a vicious cycle.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:360}\">&nbsp;<\/span><\/p>\n<p><span class=\"TextRun SCXW262857606 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW262857606 BCX0\">While these&nbsp;<\/span><span class=\"NormalTextRun SCXW262857606 BCX0\">types of&nbsp;<\/span><span class=\"NormalTextRun SCXW262857606 BCX0\">delay<\/span><span class=\"NormalTextRun SCXW262857606 BCX0\">s<\/span><span class=\"NormalTextRun SCXW262857606 BCX0\">&nbsp;can be&nbsp;<\/span><\/span><span class=\"TrackChangeTextInsertion TrackedChange SCXW262857606 BCX0\"><span class=\"TextRun SCXW262857606 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW262857606 BCX0\">managed&nbsp;<\/span><\/span><\/span><span class=\"TextRun SCXW262857606 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW262857606 BCX0\">to a certain extent, many of them&nbsp;<\/span><span class=\"NormalTextRun SCXW262857606 BCX0\">are&nbsp;<\/span><span class=\"NormalTextRun SCXW262857606 BCX0\">out&nbsp;<\/span><span class=\"NormalTextRun SCXW262857606 BCX0\">of<\/span><\/span><span class=\"TrackChangeTextDeletion TrackedChange SCXW262857606 BCX0\"><span class=\"TextRun SCXW262857606 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW262857606 BCX0\">&nbsp;<\/span><\/span><\/span><span class=\"TrackChangeTextInsertion TrackedChange SCXW262857606 BCX0\"><span class=\"TextRun SCXW262857606 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW262857606 BCX0\">a contractor<\/span><\/span><\/span><span class=\"TrackChangeTextInsertion TrackedChange SCXW262857606 BCX0\"><span class=\"TextRun SCXW262857606 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW262857606 BCX0\">\u2019s&nbsp;<\/span><\/span><\/span><span class=\"TextRun SCXW262857606 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW262857606 BCX0\">control<\/span><\/span><span class=\"TrackChangeTextInsertion TrackedChange SCXW262857606 BCX0\"><span class=\"TextRun SCXW262857606 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW262857606 BCX0\">. <\/span><\/span><\/span><span class=\"TextRun SCXW262857606 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun AdvancedProofingIssueV2 SCXW262857606 BCX0\">This is why<\/span><span class=\"NormalTextRun SCXW262857606 BCX0\">&nbsp;schedules always change.&nbsp;<\/span><span class=\"NormalTextRun AdvancedProofingIssueV2 SCXW262857606 BCX0\">As long as<\/span><span class=\"NormalTextRun SCXW262857606 BCX0\">&nbsp;the&nbsp;<\/span><span class=\"NormalTextRun SCXW262857606 BCX0\">completion date stays the same, small delays are usually tolerated. But when a delay affects the critical<\/span><span class=\"NormalTextRun SCXW262857606 BCX0\">&nbsp;path<\/span><span class=\"NormalTextRun SCXW262857606 BCX0\"> of the project or the path of tasks that are<\/span><span class=\"NormalTextRun SCXW262857606 BCX0\">&nbsp;required&nbsp;<\/span><span class=\"NormalTextRun SCXW262857606 BCX0\">to meet the completion deadline, then problems can occur.<\/span><span class=\"NormalTextRun SCXW262857606 BCX0\">&nbsp;Contracts&nbsp;<\/span><span class=\"NormalTextRun SCXW262857606 BCX0\">may<\/span><span class=\"NormalTextRun SCXW262857606 BCX0\">&nbsp;include&nbsp;<\/span><span class=\"NormalTextRun SCXW262857606 BCX0\">liquidated damages&nbsp;<\/span><span class=\"NormalTextRun SCXW262857606 BCX0\">clauses&nbsp;<\/span><span class=\"NormalTextRun SCXW262857606 BCX0\">if the<\/span><\/span><span class=\"TrackChangeTextDeletion TrackedChange SCXW262857606 BCX0\"><span class=\"TextRun SCXW262857606 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW262857606 BCX0\">&nbsp;<\/span><\/span><\/span><span class=\"TextRun SCXW262857606 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW262857606 BCX0\">completion date&nbsp;<\/span><span class=\"NormalTextRun SCXW262857606 BCX0\">is not&nbsp;<\/span><span class=\"NormalTextRun SCXW262857606 BCX0\">met<\/span><\/span><span class=\"TrackChangeTextInsertion TrackedChange SCXW262857606 BCX0\"><span class=\"TextRun SCXW262857606 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW262857606 BCX0\">,<\/span><\/span><\/span><span class=\"TrackChangeTextInsertion TrackedChange SCXW262857606 BCX0\"><span class=\"TextRun SCXW262857606 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW262857606 BCX0\"> which is why c<\/span><\/span><\/span><span class=\"TextRun SCXW262857606 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SpellingErrorV2 SCXW262857606 BCX0\">ontractors<\/span><span class=\"NormalTextRun SCXW262857606 BCX0\">&nbsp;should<\/span><\/span> <span class=\"TextRun SCXW262857606 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW262857606 BCX0\">include as much<\/span><span class=\"NormalTextRun SCXW262857606 BCX0\">&nbsp;wiggle room as possible in their schedules<\/span><\/span><span class=\"TrackChangeTextInsertion TrackedChange SCXW262857606 BCX0\"><span class=\"TextRun SCXW262857606 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW262857606 BCX0\">&nbsp;to accommodate for any&nbsp;<\/span><\/span><\/span><span class=\"TrackChangeTextInsertion TrackedChange SCXW262857606 BCX0\"><span class=\"TextRun SCXW262857606 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW262857606 BCX0\">unforeseen<\/span><\/span><\/span><span class=\"TrackChangeTextInsertion TrackedChange SCXW262857606 BCX0\"><span class=\"TextRun SCXW262857606 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW262857606 BCX0\">&nbsp;delays<\/span><\/span><\/span><span class=\"TextRun SCXW262857606 BCX0\" lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW262857606 BCX0\">.<\/span><span class=\"NormalTextRun SCXW262857606 BCX0\">&nbsp;<\/span><\/span><span class=\"EOP SCXW262857606 BCX0\" data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:360}\">&nbsp;<\/span><\/p>\n<p><iframe title=\"Manage your projects seamlessly with Buildxact scheduling\" width=\"1200\" height=\"675\" src=\"https:\/\/www.youtube.com\/embed\/HJGSCsWuGHY?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture\" allowfullscreen><\/iframe><\/p>\n<h3><strong>Conclusion&nbsp;<\/strong><\/h3>\n<p><span data-contrast=\"auto\">To put together an accurate schedule for a construction project, the best source is project data from similar jobs p<\/span><span data-contrast=\"auto\">erformed by the same&nbsp;crews.&nbsp;But<\/span><span data-contrast=\"auto\">,<\/span><span data-contrast=\"auto\">&nbsp;if you don\u2019t have that information or&nbsp;<\/span><span data-contrast=\"auto\">you&nbsp;<\/span><span data-contrast=\"auto\">are <\/span><span data-contrast=\"auto\">early in your career<\/span><span data-contrast=\"auto\">, using labor calculators or asking subcontractors to provide their own schedules are two ways to c<\/span><span data-contrast=\"auto\">reate<\/span><span data-contrast=\"auto\">&nbsp;a schedule. Ask the project team to review the schedule to see<\/span><span data-contrast=\"auto\">&nbsp;if<\/span><span data-contrast=\"auto\">&nbsp;it makes sense to everyone before publishing it.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:360}\">&nbsp;<\/span><\/p>\n<p><span data-contrast=\"auto\">There will always be outside&nbsp;<\/span><span data-contrast=\"auto\">factors&nbsp;<\/span><span data-contrast=\"auto\">that can affect a construction project\u2019s completion. Build-in<\/span><span data-contrast=\"auto\">&nbsp;float time for potential material delays, bad weather<\/span><span data-contrast=\"auto\">,<\/span><span data-contrast=\"auto\">&nbsp;and labor shortages. This will help ensure that you meet the scheduled<\/span> <span data-contrast=\"auto\">timeline<\/span><span data-contrast=\"auto\">&nbsp;of the project.<\/span><span data-contrast=\"auto\">&nbsp;<\/span><span data-contrast=\"auto\">A good<\/span><span data-contrast=\"auto\">&nbsp;starting point could be&nbsp;<\/span><a href=\"\/ca\/features\/construction-scheduling-software\/\"><span data-contrast=\"none\">this article<\/span><\/a><span data-contrast=\"auto\">&nbsp;which&nbsp;<\/span><span data-contrast=\"auto\">tells you more about our<\/span><span data-contrast=\"auto\">&nbsp;<\/span><span data-contrast=\"auto\">easy-to-use construction scheduling software for residential builders, remodelers, and contractors<\/span><span data-contrast=\"auto\">.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:360}\">&nbsp;<\/span><\/p>\n<h3><strong>Want to know more about Buildxact?&nbsp;<\/strong><\/h3>\n<p><span data-contrast=\"auto\"><a href=\"\/ca\/features\/construction-scheduling-software\/?\">Construction scheduling software<\/a>, like <\/span><span data-contrast=\"auto\">Buildxact<\/span><span data-contrast=\"auto\">, can help you estimate your construction time more efficiently, and manage scheduling changes quickly whenever they arise<\/span><\/p>\n<p><a href=\"\/ca\/trial-for-free\/#demo-section\"><span data-contrast=\"none\">Book&nbsp;a demo<\/span><\/a><span data-contrast=\"auto\">&nbsp;to see how&nbsp;Buildxact&nbsp;can transform your&nbsp;residential&nbsp;construction business, or&nbsp;<\/span><a href=\"\/trial-for-free\/\"><span data-contrast=\"none\">get started with a 14 day free trial.<\/span><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>While estimating construction project costs is\u00a0pretty straightforward,\u00a0putting together a schedule for the project can be more difficult.<\/p>\n<div style=\"display:none;\" class=\"postcatlist\"><a href='https:\/\/stg2.buildxact.com\/ca\/tag\/estimating\/'><span>Estimating<\/span><\/a> <a href='https:\/\/stg2.buildxact.com\/ca\/tag\/project-management\/'><span>Project management<\/span><\/a> <a href='https:\/\/stg2.buildxact.com\/ca\/tag\/scheduling\/'><span>Scheduling<\/span><\/a><\/div>\n","protected":false},"author":1,"featured_media":10406,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[25],"tags":[103,95,110],"contributing_author":[],"class_list":["post-7223","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-estimating","tag-project-management","tag-scheduling"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>How to estimate construction time for your project | Buildxact CA<\/title>\n<meta name=\"description\" content=\"Read how builders can use construction management software to schedule, order project tasks and account for delayed shipments and shortages.\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to estimate construction time for your project\" \/>\n<meta property=\"og:description\" content=\"Read how builders can use construction management software to schedule, order project tasks and account for delayed shipments and shortages.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/stg2.buildxact.com\/ca\/blog\/how-to-estimate-construction-time\/\" \/>\n<meta property=\"og:site_name\" content=\"Buildxact CA\" \/>\n<meta property=\"article:published_time\" content=\"2021-08-20T00:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-01-20T15:33:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/stg2.buildxact.com\/ca\/wp-content\/uploads\/sites\/14\/2023\/03\/blog_DSC02933.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"810\" \/>\n\t<meta property=\"og:image:height\" content=\"482\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/stg2.buildxact.com\/ca\/blog\/how-to-estimate-construction-time\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/stg2.buildxact.com\/ca\/blog\/how-to-estimate-construction-time\/\"},\"author\":{\"name\":\"\",\"@id\":\"\"},\"headline\":\"How to estimate construction time for your project\",\"datePublished\":\"2021-08-20T00:00:00+00:00\",\"dateModified\":\"2026-01-20T15:33:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/stg2.buildxact.com\/ca\/blog\/how-to-estimate-construction-time\/\"},\"wordCount\":1140,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/stg2.buildxact.com\/ca\/#organization\"},\"image\":{\"@id\":\"https:\/\/stg2.buildxact.com\/ca\/blog\/how-to-estimate-construction-time\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/stg2.buildxact.com\/ca\/wp-content\/uploads\/sites\/14\/2023\/03\/blog_DSC02933.jpg\",\"keywords\":[\"Estimating\",\"Project management\",\"Scheduling\"],\"articleSection\":[\"Blogs\"],\"inLanguage\":\"en-CA\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/stg2.buildxact.com\/ca\/blog\/how-to-estimate-construction-time\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/stg2.buildxact.com\/ca\/blog\/how-to-estimate-construction-time\/\",\"url\":\"https:\/\/stg2.buildxact.com\/ca\/blog\/how-to-estimate-construction-time\/\",\"name\":\"How to estimate construction time for your project | Buildxact CA\",\"isPartOf\":{\"@id\":\"https:\/\/stg2.buildxact.com\/ca\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/stg2.buildxact.com\/ca\/blog\/how-to-estimate-construction-time\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/stg2.buildxact.com\/ca\/blog\/how-to-estimate-construction-time\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/stg2.buildxact.com\/ca\/wp-content\/uploads\/sites\/14\/2023\/03\/blog_DSC02933.jpg\",\"datePublished\":\"2021-08-20T00:00:00+00:00\",\"dateModified\":\"2026-01-20T15:33:22+00:00\",\"description\":\"Read how builders can use construction management software to schedule, order project tasks and account for delayed shipments and shortages.\",\"inLanguage\":\"en-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/stg2.buildxact.com\/ca\/blog\/how-to-estimate-construction-time\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\/\/stg2.buildxact.com\/ca\/blog\/how-to-estimate-construction-time\/#primaryimage\",\"url\":\"https:\/\/stg2.buildxact.com\/ca\/wp-content\/uploads\/sites\/14\/2023\/03\/blog_DSC02933.jpg\",\"contentUrl\":\"https:\/\/stg2.buildxact.com\/ca\/wp-content\/uploads\/sites\/14\/2023\/03\/blog_DSC02933.jpg\",\"width\":810,\"height\":482,\"caption\":\"The Buildxact scheduling feature being used by a customer on a laptop\"},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/stg2.buildxact.com\/ca\/#website\",\"url\":\"https:\/\/stg2.buildxact.com\/ca\/\",\"name\":\"Buildxact CA\",\"description\":\"Estimating &amp; Job Management Software\",\"publisher\":{\"@id\":\"https:\/\/stg2.buildxact.com\/ca\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/stg2.buildxact.com\/ca\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-CA\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/stg2.buildxact.com\/ca\/#organization\",\"name\":\"Buildxact CA\",\"url\":\"https:\/\/stg2.buildxact.com\/ca\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\/\/stg2.buildxact.com\/ca\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/stg2.buildxact.com\/ca\/wp-content\/uploads\/sites\/14\/2022\/01\/buildxact-logo.png\",\"contentUrl\":\"https:\/\/stg2.buildxact.com\/ca\/wp-content\/uploads\/sites\/14\/2022\/01\/buildxact-logo.png\",\"width\":278,\"height\":68,\"caption\":\"Buildxact CA\"},\"image\":{\"@id\":\"https:\/\/stg2.buildxact.com\/ca\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"\",\"url\":\"https:\/\/stg2.buildxact.com\/ca\/author\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"How to estimate construction time for your project | Buildxact CA","description":"Read how builders can use construction management software to schedule, order project tasks and account for delayed shipments and shortages.","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"How to estimate construction time for your project","og_description":"Read how builders can use construction management software to schedule, order project tasks and account for delayed shipments and shortages.","og_url":"https:\/\/stg2.buildxact.com\/ca\/blog\/how-to-estimate-construction-time\/","og_site_name":"Buildxact CA","article_published_time":"2021-08-20T00:00:00+00:00","article_modified_time":"2026-01-20T15:33:22+00:00","og_image":[{"width":810,"height":482,"url":"https:\/\/stg2.buildxact.com\/ca\/wp-content\/uploads\/sites\/14\/2023\/03\/blog_DSC02933.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Written by":"","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/stg2.buildxact.com\/ca\/blog\/how-to-estimate-construction-time\/#article","isPartOf":{"@id":"https:\/\/stg2.buildxact.com\/ca\/blog\/how-to-estimate-construction-time\/"},"author":{"name":"","@id":""},"headline":"How to estimate construction time for your project","datePublished":"2021-08-20T00:00:00+00:00","dateModified":"2026-01-20T15:33:22+00:00","mainEntityOfPage":{"@id":"https:\/\/stg2.buildxact.com\/ca\/blog\/how-to-estimate-construction-time\/"},"wordCount":1140,"commentCount":0,"publisher":{"@id":"https:\/\/stg2.buildxact.com\/ca\/#organization"},"image":{"@id":"https:\/\/stg2.buildxact.com\/ca\/blog\/how-to-estimate-construction-time\/#primaryimage"},"thumbnailUrl":"https:\/\/stg2.buildxact.com\/ca\/wp-content\/uploads\/sites\/14\/2023\/03\/blog_DSC02933.jpg","keywords":["Estimating","Project management","Scheduling"],"articleSection":["Blogs"],"inLanguage":"en-CA","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/stg2.buildxact.com\/ca\/blog\/how-to-estimate-construction-time\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/stg2.buildxact.com\/ca\/blog\/how-to-estimate-construction-time\/","url":"https:\/\/stg2.buildxact.com\/ca\/blog\/how-to-estimate-construction-time\/","name":"How to estimate construction time for your project | Buildxact CA","isPartOf":{"@id":"https:\/\/stg2.buildxact.com\/ca\/#website"},"primaryImageOfPage":{"@id":"https:\/\/stg2.buildxact.com\/ca\/blog\/how-to-estimate-construction-time\/#primaryimage"},"image":{"@id":"https:\/\/stg2.buildxact.com\/ca\/blog\/how-to-estimate-construction-time\/#primaryimage"},"thumbnailUrl":"https:\/\/stg2.buildxact.com\/ca\/wp-content\/uploads\/sites\/14\/2023\/03\/blog_DSC02933.jpg","datePublished":"2021-08-20T00:00:00+00:00","dateModified":"2026-01-20T15:33:22+00:00","description":"Read how builders can use construction management software to schedule, order project tasks and account for delayed shipments and shortages.","inLanguage":"en-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/stg2.buildxact.com\/ca\/blog\/how-to-estimate-construction-time\/"]}]},{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/stg2.buildxact.com\/ca\/blog\/how-to-estimate-construction-time\/#primaryimage","url":"https:\/\/stg2.buildxact.com\/ca\/wp-content\/uploads\/sites\/14\/2023\/03\/blog_DSC02933.jpg","contentUrl":"https:\/\/stg2.buildxact.com\/ca\/wp-content\/uploads\/sites\/14\/2023\/03\/blog_DSC02933.jpg","width":810,"height":482,"caption":"The Buildxact scheduling feature being used by a customer on a laptop"},{"@type":"WebSite","@id":"https:\/\/stg2.buildxact.com\/ca\/#website","url":"https:\/\/stg2.buildxact.com\/ca\/","name":"Buildxact CA","description":"Estimating &amp; Job Management Software","publisher":{"@id":"https:\/\/stg2.buildxact.com\/ca\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/stg2.buildxact.com\/ca\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-CA"},{"@type":"Organization","@id":"https:\/\/stg2.buildxact.com\/ca\/#organization","name":"Buildxact CA","url":"https:\/\/stg2.buildxact.com\/ca\/","logo":{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/stg2.buildxact.com\/ca\/#\/schema\/logo\/image\/","url":"https:\/\/stg2.buildxact.com\/ca\/wp-content\/uploads\/sites\/14\/2022\/01\/buildxact-logo.png","contentUrl":"https:\/\/stg2.buildxact.com\/ca\/wp-content\/uploads\/sites\/14\/2022\/01\/buildxact-logo.png","width":278,"height":68,"caption":"Buildxact CA"},"image":{"@id":"https:\/\/stg2.buildxact.com\/ca\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"","url":"https:\/\/stg2.buildxact.com\/ca\/author\/"}]}},"_links":{"self":[{"href":"https:\/\/stg2.buildxact.com\/ca\/wp-json\/wp\/v2\/posts\/7223","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stg2.buildxact.com\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stg2.buildxact.com\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stg2.buildxact.com\/ca\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/stg2.buildxact.com\/ca\/wp-json\/wp\/v2\/comments?post=7223"}],"version-history":[{"count":0,"href":"https:\/\/stg2.buildxact.com\/ca\/wp-json\/wp\/v2\/posts\/7223\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stg2.buildxact.com\/ca\/wp-json\/wp\/v2\/media\/10406"}],"wp:attachment":[{"href":"https:\/\/stg2.buildxact.com\/ca\/wp-json\/wp\/v2\/media?parent=7223"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stg2.buildxact.com\/ca\/wp-json\/wp\/v2\/categories?post=7223"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stg2.buildxact.com\/ca\/wp-json\/wp\/v2\/tags?post=7223"},{"taxonomy":"contributing_author","embeddable":true,"href":"https:\/\/stg2.buildxact.com\/ca\/wp-json\/wp\/v2\/contributing_author?post=7223"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}